Automation Engineering (Nhà máy Hà Nam)Thực phẩm Pepsico Việt Nam
Ngành nghề: Điện - Điện tử - Điện lạnh, Thực phẩm - Đồ uống, Công nghệ thực phẩm / Dinh dưỡng, Kỹ thuật
Thu nhập: Cạnh tranh
Hình thức: Toàn thời gian
Ngày đăng: 04/11/2024
Hạn nộp: 31/12/2024
Mô tả công việc
Mô tả Công việc
Main Purpose:
Implement good PM, achieved Plan Attainment KPI
In charge for Automation for Ha Nam Plant; Implement good CM, trouble shooting, 5 Why analysis, improve CM Capabilty by training on the jobs, reduce Key break down of PC line
Leading of Project Packing Automation phase 2,3 and Project related to Automation, Biogas Generator, Convert DO by LPG for Fry pack Burner, New Value PC Project, LCC Project .
Strengthen PeMM system
Capex Spending Management
Sustainability Improvement
Accountabilities:
1. Engineering
Built maintenance master schedule for all equipment relate to Automation
Built maintenance allocation budget cost for monthly / yearly include fixed cost and maintenance cost (based on maintenance master plan, spare part consumable , outside service contract)
Built safety stock spare part control: to optimization spare part value stock in warehouse, and plan to order spare part from local markets and import spare parts from manufactures on time to ensure sufficient spare parts
Review and update preventive maintenance procedure to ensure continual operations: Trouble shooting procedure, WO & Preventive procedure.
Directly to repair the equipment and machines when major break down time happens and implement trouble shooting training on site for operators, technician
Back up automation system for whole plant
Leading for PM, CM, AM, CPM Agenda Activities
Be the stake Holder for 5 Why / RCA, break down analysis, machine Improvement
Accountable for AIB system, GEHSMS system
Deliver TPM: Strengthen PeMM system
Accountable for Sustainability: Energy, Fuel, Electric, Water Strategy reduction
2. Project:
Leading of Project Packing Automation phase 2,3 and Project relate to Automation
Leading of Project Biogas Generator, Convert DO by LPG for Fry pack Burner
Stakeholder of New Value PC Project
Support All project Owner to deliver Capex/Project OTIF
Accountable for LCC Project
Be OT Lead: VN Historian, included dashboard implementation and other initiatives
3. Team Management:
Organize employee training in terms of techniques and work procedures to help employees meet the job safely and effectively.
Train and support maintenance staff, production staff to calibrate and calibrate equipment to meet production operation requirements.
Training and support to supervise the implementation of autonomous maintenance (AM) for the operating staff of the departments.
Setting goals and evaluating work performance according to PMP process for employees
Proposing employee rewards and discipline
Communicate policies and information related to employees in the department in a timely manner.
Participate in regular meetings between supervisors and team leaders to agree on the implementation plan (including PM and non-PM) and update technical and implementation related issues.
Check and confirm PM works of maintenance team leaders after performing preventive maintenance and other repairs as required.
Participate in troubleshooting equipment problems for employees.
Implement good PM, achieved Plan Attainment KPI
In charge for Automation for Ha Nam Plant; Implement good CM, trouble shooting, 5 Why analysis, improve CM Capabilty by training on the jobs, reduce Key break down of PC line
Leading of Project Packing Automation phase 2,3 and Project related to Automation, Biogas Generator, Convert DO by LPG for Fry pack Burner, New Value PC Project, LCC Project .
Strengthen PeMM system
Capex Spending Management
Sustainability Improvement
Built maintenance master schedule for all equipment relate to Automation
Built maintenance allocation budget cost for monthly / yearly include fixed cost and maintenance cost (based on maintenance master plan, spare part consumable , outside service contract)
Built safety stock spare part control: to optimization spare part value stock in warehouse, and plan to order spare part from local markets and import spare parts from manufactures on time to ensure sufficient spare parts
Review and update preventive maintenance procedure to ensure continual operations: Trouble shooting procedure, WO & Preventive procedure.
Directly to repair the equipment and machines when major break down time happens and implement trouble shooting training on site for operators, technician
Back up automation system for whole plant
Leading for PM, CM, AM, CPM Agenda Activities
Be the stake Holder for 5 Why / RCA, break down analysis, machine Improvement
Accountable for AIB system, GEHSMS system
Deliver TPM: Strengthen PeMM system
Accountable for Sustainability: Energy, Fuel, Electric, Water Strategy reduction
Leading of Project Packing Automation phase 2,3 and Project relate to Automation
Leading of Project Biogas Generator, Convert DO by LPG for Fry pack Burner
Stakeholder of New Value PC Project
Support All project Owner to deliver Capex/Project OTIF
Accountable for LCC Project
Be OT Lead: VN Historian, included dashboard implementation and other initiatives
Organize employee training in terms of techniques and work procedures to help employees meet the job safely and effectively.
Train and support maintenance staff, production staff to calibrate and calibrate equipment to meet production operation requirements.
Training and support to supervise the implementation of autonomous maintenance (AM) for the operating staff of the departments.
Setting goals and evaluating work performance according to PMP process for employees
Proposing employee rewards and discipline
Communicate policies and information related to employees in the department in a timely manner.
Participate in regular meetings between supervisors and team leaders to agree on the implementation plan (including PM and non-PM) and update technical and implementation related issues.
Check and confirm PM works of maintenance team leaders after performing preventive maintenance and other repairs as required.
Participate in troubleshooting equipment problems for employees.
Main Purpose:
Implement good PM, achieved Plan Attainment KPI
In charge for Automation for Ha Nam Plant; Implement good CM, trouble shooting, 5 Why analysis, improve CM Capabilty by training on the jobs, reduce Key break down of PC line
Leading of Project Packing Automation phase 2,3 and Project related to Automation, Biogas Generator, Convert DO by LPG for Fry pack Burner, New Value PC Project, LCC Project .
Strengthen PeMM system
Capex Spending Management
Sustainability Improvement
Accountabilities:
1. Engineering
Built maintenance master schedule for all equipment relate to Automation
Built maintenance allocation budget cost for monthly / yearly include fixed cost and maintenance cost (based on maintenance master plan, spare part consumable , outside service contract)
Built safety stock spare part control: to optimization spare part value stock in warehouse, and plan to order spare part from local markets and import spare parts from manufactures on time to ensure sufficient spare parts
Review and update preventive maintenance procedure to ensure continual operations: Trouble shooting procedure, WO & Preventive procedure.
Directly to repair the equipment and machines when major break down time happens and implement trouble shooting training on site for operators, technician
Back up automation system for whole plant
Leading for PM, CM, AM, CPM Agenda Activities
Be the stake Holder for 5 Why / RCA, break down analysis, machine Improvement
Accountable for AIB system, GEHSMS system
Deliver TPM: Strengthen PeMM system
Accountable for Sustainability: Energy, Fuel, Electric, Water Strategy reduction
2. Project:
Leading of Project Packing Automation phase 2,3 and Project relate to Automation
Leading of Project Biogas Generator, Convert DO by LPG for Fry pack Burner
Stakeholder of New Value PC Project
Support All project Owner to deliver Capex/Project OTIF
Accountable for LCC Project
Be OT Lead: VN Historian, included dashboard implementation and other initiatives
3. Team Management:
Organize employee training in terms of techniques and work procedures to help employees meet the job safely and effectively.
Train and support maintenance staff, production staff to calibrate and calibrate equipment to meet production operation requirements.
Training and support to supervise the implementation of autonomous maintenance (AM) for the operating staff of the departments.
Setting goals and evaluating work performance according to PMP process for employees
Proposing employee rewards and discipline
Communicate policies and information related to employees in the department in a timely manner.
Participate in regular meetings between supervisors and team leaders to agree on the implementation plan (including PM and non-PM) and update technical and implementation related issues.
Check and confirm PM works of maintenance team leaders after performing preventive maintenance and other repairs as required.
Participate in troubleshooting equipment problems for employees.
Implement good PM, achieved Plan Attainment KPI
In charge for Automation for Ha Nam Plant; Implement good CM, trouble shooting, 5 Why analysis, improve CM Capabilty by training on the jobs, reduce Key break down of PC line
Leading of Project Packing Automation phase 2,3 and Project related to Automation, Biogas Generator, Convert DO by LPG for Fry pack Burner, New Value PC Project, LCC Project .
Strengthen PeMM system
Capex Spending Management
Sustainability Improvement
Built maintenance master schedule for all equipment relate to Automation
Built maintenance allocation budget cost for monthly / yearly include fixed cost and maintenance cost (based on maintenance master plan, spare part consumable , outside service contract)
Built safety stock spare part control: to optimization spare part value stock in warehouse, and plan to order spare part from local markets and import spare parts from manufactures on time to ensure sufficient spare parts
Review and update preventive maintenance procedure to ensure continual operations: Trouble shooting procedure, WO & Preventive procedure.
Directly to repair the equipment and machines when major break down time happens and implement trouble shooting training on site for operators, technician
Back up automation system for whole plant
Leading for PM, CM, AM, CPM Agenda Activities
Be the stake Holder for 5 Why / RCA, break down analysis, machine Improvement
Accountable for AIB system, GEHSMS system
Deliver TPM: Strengthen PeMM system
Accountable for Sustainability: Energy, Fuel, Electric, Water Strategy reduction
Leading of Project Packing Automation phase 2,3 and Project relate to Automation
Leading of Project Biogas Generator, Convert DO by LPG for Fry pack Burner
Stakeholder of New Value PC Project
Support All project Owner to deliver Capex/Project OTIF
Accountable for LCC Project
Be OT Lead: VN Historian, included dashboard implementation and other initiatives
Organize employee training in terms of techniques and work procedures to help employees meet the job safely and effectively.
Train and support maintenance staff, production staff to calibrate and calibrate equipment to meet production operation requirements.
Training and support to supervise the implementation of autonomous maintenance (AM) for the operating staff of the departments.
Setting goals and evaluating work performance according to PMP process for employees
Proposing employee rewards and discipline
Communicate policies and information related to employees in the department in a timely manner.
Participate in regular meetings between supervisors and team leaders to agree on the implementation plan (including PM and non-PM) and update technical and implementation related issues.
Check and confirm PM works of maintenance team leaders after performing preventive maintenance and other repairs as required.
Participate in troubleshooting equipment problems for employees.
Yêu cầu
Yêu Cầu Công Việc
Graduated from University of Electrical/Electronic/Automation Engineering
At least 5 years of experience in a similar position
Knowledge of PLC & SCADA, pneumatic and automation is preferred.
Basic computer skills in office (Word, Excel, Power Point) and good use of Autocad software.
English skill: good for verbal & written communication.
TPM Knowledge & Execution
Project Management
Good problem solving and communication skills
Graduated from University of Electrical/Electronic/Automation Engineering
At least 5 years of experience in a similar position
Knowledge of PLC & SCADA, pneumatic and automation is preferred.
Basic computer skills in office (Word, Excel, Power Point) and good use of Autocad software.
English skill: good for verbal & written communication.
TPM Knowledge & Execution
Project Management
Good problem solving and communication skills
Quyền lợi
Chế độ bảo hiểm
Du Lịch
Chế độ thưởng
Chăm sóc sức khỏe
Đào tạo
Tăng lương
Du Lịch
Chế độ thưởng
Chăm sóc sức khỏe
Đào tạo
Tăng lương
Thông tin khác
Địa điểm làm việc
Hà Nam
Khu công nghiệp Đồng Văn I Mở rộng, Bạch Thượng, Duy Tiên, Hà Nam
Hà Nội
Hà Nội
Hưng Yên
Đường D3, Khu công nghiệp Phố Nối A, Huyện Văn Lâm, Tỉnh Hưng Yên
Hà Nam
Khu công nghiệp Đồng Văn I Mở rộng, Bạch Thượng, Duy Tiên, Hà Nam
Hà Nội
Hà Nội
Hưng Yên
Đường D3, Khu công nghiệp Phố Nối A, Huyện Văn Lâm, Tỉnh Hưng Yên
Giới thiệu công ty
Việc làm tương tự
Chuyên viên kỹ thuật điện
Công Ty Cổ Phần Đầu Tư Công nghệ Thông Minh
13 Tr - 20 Tr VND
Hà Nội
10/12/2024
Kỹ Thuật Điện Nước
Công Ty Cổ Phần Quốc Tế Tập Đoàn Khách Sạn A25
14 - 20 triệu
Hà Nội, Đà Nẵng
18/12/2024
Nhân Viên Công Vụ - Kỹ Thuật Điện
Công Ty TNHH Samas Wiring Systems Vina (Samas Wiring Systems Vina)
8 - 9 triệu
Hà Nam
30/11/2024
Kỹ Thuật Điện (Lương 15-30 Triệu)
CÔNG TY CỔ PHẦN VN ECOFLOOR
15 - 30 triệu
Hà Nội, Hà Nam
12/12/2024
KỸ THUẬT ĐIỆN LẠNH
Công Ty Cổ Phần Quốc Tế Tập Đoàn Khách Sạn A25
15 Tr - 25 Tr VND
Hà Nội, Hồ Chí Minh
30/12/2024
Kỹ Thuật Điện Lạnh
Công Ty Cổ Phần Xuất Nhập Khẩu Thiết Bị Công Nghiệp Cổng Vàng
8 - 15 triệu
Hà Nội
30/11/2024
Vị trí Automation Engineering (Nhà máy Hà Nam) do công ty Thực phẩm Pepsico Việt Nam tuyển dụng tại Hà Nội, Hà Nam, Hưng Yên, Joboko tự động tổng hợp mức lương Cạnh tranh, tìm thêm việc làm về Automation Engineering (Nhà máy Hà Nam) hoặc công ty Thực phẩm Pepsico Việt Nam ở các link phía trên
Giới thiệu công ty