Logistic Engineer - HCM (For Fresh Graduate Student)
CÔNG TY TNHH SIAM CITY CEMENT (VIETNAM) (INSEE)
Địa điểm làm việc: Hồ Chí Minh
Hết hạn: 25/12/2024
- Chi tiết công việc
- Giới thiệu công ty
Thu nhập: Cạnh tranh
Loại hình: Toàn thời gian
Chức vụ: Nhân viên
Kinh nghiệm: 1 năm
Mô tả công việc
Mô tả Công việc
Update new tech application or develop new optimized solutions related to Log's Operations equipment
Define key tasks which need to automate or change in Logistics Operation.
Review and benchmark operation cost [include maintenance cost] of handling, load in, unload of 5 cement plants between current equipment & new application /improvement.
Propose new investment [needed] to increase capacity of handling/ load on/ unload of Logistic Operation to adapt Business model and Fin plan.
Propose improvement to increasing efficiency of load/unload equipment.
Cooperate with project team to control project timeline and ensure the adaptivity with practice
Reviews all designs related to new equipment/infrastructure investment and propose any adjust to increase adaptiveness.
Cooperate with Site's Logistics Superintendent/ Logistic Manager to supervise project timeline and installation and alert if anything hasn't been correct as original design.
Coordinate with Site's Operation Superintendent to:
Review/draw commissioning scenario for testing installed equipment.
Implement maintenance requirements for both daily inspection [by Log operator] and cycle inspection of maintenance.
Implement check list requirements for preventive maintenance.
Implement spare parts list need to stock for corrective and predictive maintenance
Supervise and audit the logistics' maintenance cost & compliance at 4 plants.
Review and update all daily equipment's checklist/ requirement and compliance of Log Administrator. Review equipment'preventive and corrective maintenance tasks and schedules.
Review and report all equipment's operation identification.
Analyze and report the maintenance cost of Logistic of 4 Plants and benchmark with Budget.
Cooperate and guide Plant's Logistic team in emergency case.
Define key tasks which need to automate or change in Logistics Operation.
Review and benchmark operation cost [include maintenance cost] of handling, load in, unload of 5 cement plants between current equipment & new application /improvement.
Propose new investment [needed] to increase capacity of handling/ load on/ unload of Logistic Operation to adapt Business model and Fin plan.
Propose improvement to increasing efficiency of load/unload equipment.
Reviews all designs related to new equipment/infrastructure investment and propose any adjust to increase adaptiveness.
Cooperate with Site's Logistics Superintendent/ Logistic Manager to supervise project timeline and installation and alert if anything hasn't been correct as original design.
Coordinate with Site's Operation Superintendent to:
Review/draw commissioning scenario for testing installed equipment.
Implement maintenance requirements for both daily inspection [by Log operator] and cycle inspection of maintenance.
Implement check list requirements for preventive maintenance.
Implement spare parts list need to stock for corrective and predictive maintenance
Review and update all daily equipment's checklist/ requirement and compliance of Log Administrator. Review equipment'preventive and corrective maintenance tasks and schedules.
Review and report all equipment's operation identification.
Analyze and report the maintenance cost of Logistic of 4 Plants and benchmark with Budget.
Cooperate and guide Plant's Logistic team in emergency case.
Update new tech application or develop new optimized solutions related to Log's Operations equipment
Define key tasks which need to automate or change in Logistics Operation.
Review and benchmark operation cost [include maintenance cost] of handling, load in, unload of 5 cement plants between current equipment & new application /improvement.
Propose new investment [needed] to increase capacity of handling/ load on/ unload of Logistic Operation to adapt Business model and Fin plan.
Propose improvement to increasing efficiency of load/unload equipment.
Cooperate with project team to control project timeline and ensure the adaptivity with practice
Reviews all designs related to new equipment/infrastructure investment and propose any adjust to increase adaptiveness.
Cooperate with Site's Logistics Superintendent/ Logistic Manager to supervise project timeline and installation and alert if anything hasn't been correct as original design.
Coordinate with Site's Operation Superintendent to:
Review/draw commissioning scenario for testing installed equipment.
Implement maintenance requirements for both daily inspection [by Log operator] and cycle inspection of maintenance.
Implement check list requirements for preventive maintenance.
Implement spare parts list need to stock for corrective and predictive maintenance
Supervise and audit the logistics' maintenance cost & compliance at 4 plants.
Review and update all daily equipment's checklist/ requirement and compliance of Log Administrator. Review equipment'preventive and corrective maintenance tasks and schedules.
Review and report all equipment's operation identification.
Analyze and report the maintenance cost of Logistic of 4 Plants and benchmark with Budget.
Cooperate and guide Plant's Logistic team in emergency case.
Define key tasks which need to automate or change in Logistics Operation.
Review and benchmark operation cost [include maintenance cost] of handling, load in, unload of 5 cement plants between current equipment & new application /improvement.
Propose new investment [needed] to increase capacity of handling/ load on/ unload of Logistic Operation to adapt Business model and Fin plan.
Propose improvement to increasing efficiency of load/unload equipment.
Reviews all designs related to new equipment/infrastructure investment and propose any adjust to increase adaptiveness.
Cooperate with Site's Logistics Superintendent/ Logistic Manager to supervise project timeline and installation and alert if anything hasn't been correct as original design.
Coordinate with Site's Operation Superintendent to:
Review/draw commissioning scenario for testing installed equipment.
Implement maintenance requirements for both daily inspection [by Log operator] and cycle inspection of maintenance.
Implement check list requirements for preventive maintenance.
Implement spare parts list need to stock for corrective and predictive maintenance
Review and update all daily equipment's checklist/ requirement and compliance of Log Administrator. Review equipment'preventive and corrective maintenance tasks and schedules.
Review and report all equipment's operation identification.
Analyze and report the maintenance cost of Logistic of 4 Plants and benchmark with Budget.
Cooperate and guide Plant's Logistic team in emergency case.
Yêu cầu
Yêu Cầu Công Việc
Fresh graduate or less than 1 year working experience (ability to perform full-time job in June 2024)
Majors: Supply Chain / Logistics / Transportation/ Mechanical Engineer/Electrical Engineer
GPA: >= 6.5/10 or 2.6/4
English: TOEIC 450 or equivalent (or pass our English test)
Proactive, fast learner, result-driven, focus on individual and career development.
Working location:
Head Office - 11 Doan Van Bo, Ward 13, District 4, HCMC
Fresh graduate or less than 1 year working experience (ability to perform full-time job in June 2024)
Majors: Supply Chain / Logistics / Transportation/ Mechanical Engineer/Electrical Engineer
GPA: >= 6.5/10 or 2.6/4
English: TOEIC 450 or equivalent (or pass our English test)
Proactive, fast learner, result-driven, focus on individual and career development.
Working location:
Head Office - 11 Doan Van Bo, Ward 13, District 4, HCMC
Quyền lợi
Chế độ bảo hiểm
Du Lịch
Phụ cấp
Chế độ thưởng
Chăm sóc sức khỏe
Đào tạo
Tăng lương
Công tác phí
Nghỉ phép năm
Du Lịch
Phụ cấp
Chế độ thưởng
Chăm sóc sức khỏe
Đào tạo
Tăng lương
Công tác phí
Nghỉ phép năm
Thông tin khác
Địa điểm làm việc
Hồ Chí Minh
11 Đoàn Văn Bơ, Quận 4, Hồ Chí Minh
Hồ Chí Minh
11 Đoàn Văn Bơ, Quận 4, Hồ Chí Minh
Thông tin chung
- Thu nhập: Cạnh tranh
Cách thức ứng tuyển
Ứng viên nộp hồ sơ trực tuyến bằng cách bấm nút Ứng tuyển bên dưới:
Hạn nộp: 25/12/2024
Giới thiệu công ty
Xem trang công ty
Tập đoàn Siam City Cement (SCCC) được thành lập năm 1969 và bắt đầu hoạt động sản xuất xi măng bằng việc hoàn thành nhà máy xi măng đầu tiên vào năm 1972. Năm 1977, công ty được niêm yết trên thị trường chứng khoán Thái Lan. Là một trong những doanh nghiệp sản xuất xi măng lớn nhất Thái Lan, SCCC đã cung cấp vật liệu và dịch vụ xây dựng hàng đầu thế giới, có ý nghĩa sống còn đổi với sự tăng trưởng kinh tế ở Thái Lan trong gần 50 năm. SCCC đã thực hiện chiến lược mở rộng dấu ấn của mình trên...
Quy mô công ty
Từ 501 - 1000 nhân viên
Việc làm tương tự
CÔNG TY TNHH AEON DELIGHT (HỒ CHÍ MINH)
7 triệu - 9 triệu VND
04/12/2024
Hồ Chí Minh, Bình Dương
CHI NHÁNH CÔNG TY TNHH ĐẦU TƯ VÀ PHÁT TRIỂN HOÀNG SA VIỆT
Thoả thuận
08/12/2024
Hồ Chí Minh
hỗ trợ doanh nghiệp
Giải thưởng
của chúng tôi
Top 3
Nền tảng số tiêu biểu của Bộ
TT&TT 2022.
Top 15
Startup Việt xuất sắc 2019 do VNExpress tổ chức.
Top 10
Doanh nghiệp khởi nghiệp sáng tạo Việt Nam - Hội đồng tư vấn kinh doanh ASEAN bình chọn.
Giải Đồng
Sản phẩm công nghệ số Make In Viet Nam 2023.